![]() |
![]() |
![]() |
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
![]() TITLE(s): RIGGING SLINGER (logging) Directs CHOKE SETTERS (logging) in high lead, slack line, or similar log yarding system: Determines sequence of logs to be yarded, according to guidelines established by HOOK TENDER (logging). Issues directions to crew regarding logs to be yarded, positioning and securing of chokers, and position of crew during movement of logs. Signals YARDING ENGINEER (logging) to control positioning of choker cables for setting and yarding of logs over cutting area, using portable radio transmitter. Signals to inform others of fire, injuries, need for repairs or revisions to rigging, and other conditions. Trains new workers in choker setting techniques, safety practices, and whistle signals. May perform choker setting duties. May lead workers in installing, moving, and dismantling yarder rigging. GOE: 05.12.04 STRENGTH: M GED: R3 M1 L2 SVP: 5 DLU: 77 ONET CROSSWALK: 73099C Rigging Slingers and Chasers |
![]() ![]() |
||
Language Translations | | Espaρol | Children | Lawyers | E-mail "Immigration Superhighway", "Immigration Central", "Immigration Assistant", "Immigration Expert", "Immigration Expert Pro" and "Immigration USA" are trademarks of Information Technology Associates.
© 1995 - 2015 Photius Coutsoukis and Information
Technology Associates (All Rights Reserved).
|
Previous Next Contents ONET About
![]() |
CODE: 921.364-010 Buy the DOT: Download
TITLE(s):
RIGGING SLINGER (logging)
Directs CHOKE SETTERS (logging) in high lead, slack line, or similar log yarding system:
Determines sequence of logs to be yarded, according to guidelines established by HOOK TENDER
(logging). Issues directions to crew regarding logs to be yarded, positioning and securing of
chokers, and position of crew during movement of logs. Signals YARDING ENGINEER (logging) to
control positioning of choker cables for setting and yarding of logs over cutting area, using
portable radio transmitter. Signals to inform others of fire, injuries, need for repairs or
revisions to rigging, and other conditions. Trains new workers in choker setting techniques, safety
practices, and whistle signals. May perform choker setting duties. May lead workers in installing,
moving, and dismantling yarder rigging.
GOE: 05.12.04 STRENGTH: M GED: R3 M1 L2 SVP: 5 DLU: 77
ONET CROSSWALK: 73099C Rigging Slingers and Chasers
© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03